|
This project included the re-roofing of two existing buildings on the campus and the complete replacement of exterior walkway structures and canopies. The design respected the historic significance of the existing Sarasota School of Architecture sanctuary building. Construction of a 6,000 SF sanctuary for the church (Phase I) was completed in 2000.
Return to Project List
|
|